On a Saturday another crew of concrete workers came and form the foundation walls. They setup the wood boards and 2x4s so that the concrete will be poured in between the boards.
|
View 1 of the walls. |
![]() |
|
View 2 of the walls. |
![]() |
|
A look inside the walls. |
![]() |


